Equipment for a airport kitchen
| Equipment | Standard model | Price from |
|---|---|---|
| Combi Oven | 10 GN 1/1 combi steamer — supply, install and commission | ₹9,10,000 |
| Blast Chiller | 10 GN 1/1, +70 °C to +3 °C in 90 min | ₹3,92,000 |
| Walk-in Cold Room | 8×8×8 ft, 80 mm PUF panels | ₹5,04,000 |
| SS Airport Luggage Trolley | Nestable, dead-man brake | ₹31,000 |
| Stainless Steel Barricading | 2 m panel × 1.1 m high, 38 mm frame | ₹13,300 |
| Kitchen Exhaust Hood | 10 ft wall canopy, baffle filters | ₹1,05,000 |
Landed setup cost in Kuala Lumpur
Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:
| Size | Equipment ex-works | Landed |
|---|---|---|
| Small — up to 100 meals a day / 40 covers | ₹26,02,500 | MYR 155,600 (₹32,36,481) |
| Medium — 100 to 500 meals a day / 80–120 covers | ₹52,05,000 | MYR 306,022 (₹63,65,265) |
| Large — 500 to 2,000 meals a day | ₹1,01,97,300 | MYR 599,356 (₹1,24,66,605) |
Rates as of October 2026. Build your own list in the kitchen setup estimator.
How we deliver a airport kitchen project
- Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
- Layout and equipment schedule — 2D layout, gas, water, drain and power points.
- Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
- Shipping and clearance — crated and shipped to Port Klang, documents for customs.
- Handover and service — staff training, warranty and AMC.
Compliance in Malaysia
Kitchens in Kuala Lumpur are checked against SIRIM, ST gas approval. Supply is 240 V / 415 V, 50 Hz and kitchens commonly run on LPG, natural gas. We build hoods, gas trains and drainage to suit.
Why Fabrrinox Potnis
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
FAQs: Airport Kitchen in Kuala Lumpur
What equipment does a airport kitchen need?
A typical airport kitchen needs combi oven, blast chiller, walk-in cold room, SS airport luggage trolley, stainless steel barricading and kitchen exhaust hood, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.
How much does it cost to set up a airport kitchen in Kuala Lumpur?
Our estimate for a small setup is about MYR 155,600, medium about MYR 306,022 and large about MYR 599,356, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.
How long does the project take?
Design 1–2 weeks, fabrication 4–6 weeks, sea transit 9–12 days to Port Klang, then clearance and installation.
Do you provide the kitchen layout and drawings?
Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.
Which approvals should the kitchen meet in Malaysia?
Plan for SIRIM, ST gas approval. We design to these and share technical sheets your consultant needs.
Do you offer maintenance after installation?
Yes: annual maintenance contracts with preventive visits, exhaust cleaning and spare parts through partners or scheduled service trips.