ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Travel & Transport · Lisbon, Portugal

Airport Kitchen Equipment in Lisbon

Fabrrinox Potnis designs, fabricates and exports complete airport kitchen setups for airport operators, concessionaires and lounge operators in Lisbon, Portugal. We plan airside-approved kitchens, lounges and F&B outlets, plus trolleys and barricading.

Small setup
EUR 36,634 (₹37,54,934)
Medium setup
EUR 70,764 (₹72,53,319)
Sea transit
26–30 days to Lisbon / Sines

Equipment for a airport kitchen

EquipmentStandard modelPrice from
Combi Oven10 GN 1/1 combi steamer — supply, install and commission₹9,10,000
Blast Chiller10 GN 1/1, +70 °C to +3 °C in 90 min₹3,92,000
Walk-in Cold Room8×8×8 ft, 80 mm PUF panels₹5,04,000
SS Airport Luggage TrolleyNestable, dead-man brake₹31,000
Stainless Steel Barricading2 m panel × 1.1 m high, 38 mm frame₹13,300
Kitchen Exhaust Hood10 ft wall canopy, baffle filters₹1,05,000

Landed setup cost in Lisbon

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹26,02,500EUR 36,634 (₹37,54,934)
Medium — 100 to 500 meals a day / 80–120 covers₹52,05,000EUR 70,764 (₹72,53,319)
Large — 500 to 2,000 meals a day₹1,01,97,300EUR 138,695 (₹1,42,16,267)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a airport kitchen project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Lisbon / Sines, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in Portugal

Kitchens in Lisbon are checked against CE marking, ASAE, HACCP. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on Natural gas, LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
  • Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.

FAQs: Airport Kitchen in Lisbon

What equipment does a airport kitchen need?

A typical airport kitchen needs combi oven, blast chiller, walk-in cold room, SS airport luggage trolley, stainless steel barricading and kitchen exhaust hood, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a airport kitchen in Lisbon?

Our estimate for a small setup is about EUR 36,634, medium about EUR 70,764 and large about EUR 138,695, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 26–30 days to Lisbon / Sines, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in Portugal?

Plan for CE marking, ASAE, HACCP. We design to these and share technical sheets your consultant needs.

Can you work with our architect or consultant?

Yes. We work from consultant drawings, submit shop drawings for approval and coordinate with MEP contractors on site.

Airport Kitchen equipment nearby

Other kitchens we set up in Lisbon

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.