ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Centralised & Institutional · Auckland, New Zealand

Centralised Kitchen Equipment in Auckland

Fabrrinox Potnis designs, fabricates and exports complete centralised kitchen setups for restaurant chains, caterers, flight kitchens and meal-subscription brands in Auckland, New Zealand. We plan bulk cooking, blast chilling and portioning for 2,000 to 50,000 meals a day.

Small setup
NZD 67,592 (₹35,48,590)
Medium setup
NZD 129,991 (₹68,24,509)
Sea transit
26–32 days to Auckland

Equipment for a centralised kitchen

EquipmentStandard modelPrice from
Steam Jacketed Kettle100 L, SS 304 inner shell₹2,94,000
Tilting Bratt Pan80 L, 10 mm SS-clad base₹2,52,000
Rice Steam Cooking Cabinet6 tray, 60 kg rice per batch₹1,19,000
Blast Chiller10 GN 1/1, +70 °C to +3 °C in 90 min₹3,92,000
Walk-in Cold Room8×8×8 ft, 80 mm PUF panels₹5,04,000
Automatic Roti Machine1,000–1₹4,48,000
Vegetable Cutting Machine300 kg/hour, 5 discs for slicing₹53,000
Conveyor Dishwasher150–200 racks/hour, pre-wash₹13,30,000

Landed setup cost in Auckland

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹26,02,500NZD 67,592 (₹35,48,590)
Medium — 100 to 500 meals a day / 80–120 covers₹52,05,000NZD 129,991 (₹68,24,509)
Large — 500 to 2,000 meals a day₹1,01,97,300NZD 254,809 (₹1,33,77,464)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a centralised kitchen project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Auckland, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in New Zealand

Kitchens in Auckland are checked against Gas certification, MPI food rules. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on Natural gas, LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
  • Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.

FAQs: Centralised Kitchen in Auckland

What equipment does a centralised kitchen need?

A typical centralised kitchen needs steam jacketed kettle, tilting bratt pan, rice steam cooking cabinet, blast chiller, walk-in cold room and automatic roti machine, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a centralised kitchen in Auckland?

Our estimate for a small setup is about NZD 67,592, medium about NZD 129,991 and large about NZD 254,809, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 26–32 days to Auckland, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in New Zealand?

Plan for Gas certification, MPI food rules. We design to these and share technical sheets your consultant needs.

Do you offer maintenance after installation?

Yes: annual maintenance contracts with preventive visits, exhaust cleaning and spare parts through partners or scheduled service trips.

Centralised Kitchen equipment nearby

Other kitchens we set up in Auckland

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.