Equipment for a corporate cafeteria
| Equipment | Standard model | Price from |
|---|---|---|
| Live Cooking Counter | 6 ft show counter with induction or gas hob | ₹98,000 |
| Bain Marie | 4 well GN 1/1, wet or dry heat | ₹50,500 |
| Salad Bar | 6 GN 1/3 chilled, sneeze guard | ₹1,12,000 |
| Coffee Counter | 6 ft with knock box, grinder shelf | ₹84,000 |
| Cafeteria Tray Line | Tray slide, cutlery dispensers | ₹77,000 |
| Hood-type Dishwasher | 60 racks/hour, 85 °C final rinse | ₹3,64,000 |
Landed setup cost in Kuwait City
Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:
| Size | Equipment ex-works | Landed |
|---|---|---|
| Small — up to 100 meals a day / 40 covers | ₹9,72,400 | KWD 4,222 (₹12,20,161) |
| Medium — 100 to 500 meals a day / 80–120 covers | ₹19,44,800 | KWD 7,963 (₹23,01,188) |
| Large — 500 to 2,000 meals a day | ₹38,18,400 | KWD 15,203 (₹43,93,796) |
Rates as of October 2026. Build your own list in the kitchen setup estimator.
How we deliver a corporate cafeteria project
- Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
- Layout and equipment schedule — 2D layout, gas, water, drain and power points.
- Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
- Shipping and clearance — crated and shipped to Shuwaikh, documents for customs.
- Handover and service — staff training, warranty and AMC.
Compliance in Kuwait
Kitchens in Kuwait City are checked against PAAF food safety, Kuwait Fire Force. Supply is 240 V / 415 V, 50 Hz and kitchens commonly run on LPG. We build hoods, gas trains and drainage to suit.
Why Fabrrinox Potnis
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
FAQs: Corporate Cafeteria in Kuwait City
What equipment does a corporate cafeteria need?
A typical corporate cafeteria needs live cooking counter, bain marie, salad bar, coffee counter, cafeteria tray line and hood-type dishwasher, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.
How much does it cost to set up a corporate cafeteria in Kuwait City?
Our estimate for a small setup is about KWD 4,222, medium about KWD 7,963 and large about KWD 15,203, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.
How long does the project take?
Design 1–2 weeks, fabrication 4–6 weeks, sea transit 8–10 days to Shuwaikh, then clearance and installation.
Do you provide the kitchen layout and drawings?
Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.
Which approvals should the kitchen meet in Kuwait?
Plan for PAAF food safety, Kuwait Fire Force. We design to these and share technical sheets your consultant needs.
Can you work with our architect or consultant?
Yes. We work from consultant drawings, submit shop drawings for approval and coordinate with MEP contractors on site.