ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Centralised & Institutional · Muharraq, Bahrain

Corporate Cafeteria Equipment in Muharraq

Fabrrinox Potnis designs, fabricates and exports complete corporate cafeteria setups for corporate offices, banks and business parks in Muharraq, Bahrain. We plan multi-counter cafeterias with live stations and quick service.

Small setup
BHD 5,636 (₹13,24,571)
Medium setup
BHD 10,699 (₹25,14,221)
Sea transit
7–9 days to Khalifa Bin Salman

Equipment for a corporate cafeteria

EquipmentStandard modelPrice from
Live Cooking Counter6 ft show counter with induction or gas hob₹98,000
Bain Marie4 well GN 1/1, wet or dry heat₹50,500
Salad Bar6 GN 1/3 chilled, sneeze guard₹1,12,000
Coffee Counter6 ft with knock box, grinder shelf₹84,000
Cafeteria Tray LineTray slide, cutlery dispensers₹77,000
Hood-type Dishwasher60 racks/hour, 85 °C final rinse₹3,64,000

Landed setup cost in Muharraq

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹9,72,400BHD 5,636 (₹13,24,571)
Medium — 100 to 500 meals a day / 80–120 covers₹19,44,800BHD 10,699 (₹25,14,221)
Large — 500 to 2,000 meals a day₹38,18,400BHD 20,494 (₹48,16,089)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a corporate cafeteria project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Khalifa Bin Salman, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in Bahrain

Kitchens in Muharraq are checked against Ministry of Health food safety, Civil Defence. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.

FAQs: Corporate Cafeteria in Muharraq

What equipment does a corporate cafeteria need?

A typical corporate cafeteria needs live cooking counter, bain marie, salad bar, coffee counter, cafeteria tray line and hood-type dishwasher, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a corporate cafeteria in Muharraq?

Our estimate for a small setup is about BHD 5,636, medium about BHD 10,699 and large about BHD 20,494, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 7–9 days to Khalifa Bin Salman, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in Bahrain?

Plan for Ministry of Health food safety, Civil Defence. We design to these and share technical sheets your consultant needs.

Can you work with our architect or consultant?

Yes. We work from consultant drawings, submit shop drawings for approval and coordinate with MEP contractors on site.

Corporate Cafeteria equipment nearby

Other kitchens we set up in Muharraq

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.