ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Centralised & Institutional · Port Louis, Mauritius

Corporate Cafeteria Equipment in Port Louis

Fabrrinox Potnis designs, fabricates and exports complete corporate cafeteria setups for corporate offices, banks and business parks in Port Louis, Mauritius. We plan multi-counter cafeterias with live stations and quick service.

Small setup
MUR 691,587 (₹13,48,595)
Medium setup
MUR 1,304,202 (₹25,43,193)
Sea transit
10–14 days to Port Louis

Equipment for a corporate cafeteria

EquipmentStandard modelPrice from
Live Cooking Counter6 ft show counter with induction or gas hob₹98,000
Bain Marie4 well GN 1/1, wet or dry heat₹50,500
Salad Bar6 GN 1/3 chilled, sneeze guard₹1,12,000
Coffee Counter6 ft with knock box, grinder shelf₹84,000
Cafeteria Tray LineTray slide, cutlery dispensers₹77,000
Hood-type Dishwasher60 racks/hour, 85 °C final rinse₹3,64,000

Landed setup cost in Port Louis

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹9,72,400MUR 691,587 (₹13,48,595)
Medium — 100 to 500 meals a day / 80–120 covers₹19,44,800MUR 1,304,202 (₹25,43,193)
Large — 500 to 2,000 meals a day₹38,18,400MUR 2,484,785 (₹48,45,330)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a corporate cafeteria project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Port Louis, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in Mauritius

Kitchens in Port Louis are checked against MSB, Ministry of Health. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
  • Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.

FAQs: Corporate Cafeteria in Port Louis

What equipment does a corporate cafeteria need?

A typical corporate cafeteria needs live cooking counter, bain marie, salad bar, coffee counter, cafeteria tray line and hood-type dishwasher, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a corporate cafeteria in Port Louis?

Our estimate for a small setup is about MUR 691,587, medium about MUR 1,304,202 and large about MUR 2,484,785, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 10–14 days to Port Louis, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in Mauritius?

Plan for MSB, Ministry of Health. We design to these and share technical sheets your consultant needs.

Do you offer maintenance after installation?

Yes: annual maintenance contracts with preventive visits, exhaust cleaning and spare parts through partners or scheduled service trips.

Other kitchens we set up in Port Louis

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.