ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Centralised & Institutional · Wellington, New Zealand

Corporate Cafeteria Equipment in Wellington

Fabrrinox Potnis designs, fabricates and exports complete corporate cafeteria setups for corporate offices, banks and business parks in Wellington, New Zealand. We plan multi-counter cafeterias with live stations and quick service.

Small setup
NZD 27,587 (₹14,48,341)
Medium setup
NZD 52,109 (₹27,35,706)
Sea transit
26–32 days to Auckland

Equipment for a corporate cafeteria

EquipmentStandard modelPrice from
Live Cooking Counter6 ft show counter with induction or gas hob₹98,000
Bain Marie4 well GN 1/1, wet or dry heat₹50,500
Salad Bar6 GN 1/3 chilled, sneeze guard₹1,12,000
Coffee Counter6 ft with knock box, grinder shelf₹84,000
Cafeteria Tray LineTray slide, cutlery dispensers₹77,000
Hood-type Dishwasher60 racks/hour, 85 °C final rinse₹3,64,000

Landed setup cost in Wellington

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹9,72,400NZD 27,587 (₹14,48,341)
Medium — 100 to 500 meals a day / 80–120 covers₹19,44,800NZD 52,109 (₹27,35,706)
Large — 500 to 2,000 meals a day₹38,18,400NZD 97,375 (₹51,12,172)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a corporate cafeteria project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Auckland, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in New Zealand

Kitchens in Wellington are checked against Gas certification, MPI food rules. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on Natural gas, LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
  • Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.

FAQs: Corporate Cafeteria in Wellington

What equipment does a corporate cafeteria need?

A typical corporate cafeteria needs live cooking counter, bain marie, salad bar, coffee counter, cafeteria tray line and hood-type dishwasher, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a corporate cafeteria in Wellington?

Our estimate for a small setup is about NZD 27,587, medium about NZD 52,109 and large about NZD 97,375, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 26–32 days to Auckland, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in New Zealand?

Plan for Gas certification, MPI food rules. We design to these and share technical sheets your consultant needs.

Can you work with our architect or consultant?

Yes. We work from consultant drawings, submit shop drawings for approval and coordinate with MEP contractors on site.

Corporate Cafeteria equipment nearby

Other kitchens we set up in Wellington

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.