For Denver, we quote ex-works, FOB Nhava Sheva or CIF New York / New Jersey, whichever suits your importer. In Denver it is a common choice for QSR kitchens.
Fast Food Kitchen Fabrication price in Denver
The base model costs ₹12,60,000 ex-works (≈ USD 14,237) package. Here is an estimate for one unit landed in Denver by the cheapest shipping option:
| Cost element | USD | INR |
|---|---|---|
| Ex-works price | USD 14,237 | ₹12,60,000 |
| Export packing, haulage to JNPT, customs clearance | USD 800 | ₹70,800 |
| Ocean freight (LCL (shared container), 10.0 CBM) | USD 1,100 | ₹97,350 |
| Marine insurance | USD 89 | ₹7,855 |
| CIF New York / New Jersey | USD 16,226 | ₹14,36,005 |
| Import duty (MFN duty + 10% reciprocal tariff on Indian goods + 0.47% MPF/HMF) | USD 0 | ₹0 |
| US Section 232 steel duty (est.) | USD 3,383 | ₹2,99,430 |
| Other import levies | USD 1,574 | ₹1,39,335 |
| Destination clearance & local delivery | USD 1,100 | ₹97,350 |
| Estimated landed cost | USD 22,284 | ₹19,72,120 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Technical specifications
| Standard model | Complete QSR line: fryers, griddle, pass, refrigeration, hood — 300 sq ft |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8419.81 |
| Packed volume / weight | 10 CBM · 1200 kg (base model) |
| Power & fuel in USA | 120 V / 208–240 V, 60 Hz; Natural gas, propane |
| Standards | NSF/ANSI, UL / ETL listing, local health and fire code |
Options you can specify
- Export builds for 60 Hz and 120/208–240 V supplies
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Flame-failure devices, piezo ignition and thermostats
- Gas (LPG / PNG / natural gas), electric or induction versions
- Number of burners or tanks and their ratings
Fast Food Kitchen Fabrication for Denver kitchens
Our fast food kitchen fabrication goes into these kinds of kitchens:
Shipping, customs and installation for Denver
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to New York / New Jersey (about 32–38 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why buyers in Denver choose Fabrrinox Potnis
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
FAQs: Fast Food Kitchen Fabrication in Denver
What does a fast food kitchen fabrication cost delivered to Denver?
The ex-works price is ₹12,60,000 (about USD 14,237). Shipped from Nhava Sheva to New York / New Jersey with insurance, import duty, taxes and local delivery, one unit lands at roughly USD 22,284. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Denver take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to New York / New Jersey is about 32–38 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in USA?
We ship the fast food kitchen fabrication under HS 8419.81. Our estimate for USA uses: MFN duty + 10% reciprocal tariff on Indian goods + 0.47% MPF/HMF; Section 232 50% on steel content applies to many steel articles and appliances. Your customs broker confirms the final rate at clearance.
Is there a minimum order quantity?
No fixed minimum. Small orders ship as LCL (shared container) from 1 CBM; above about 15 CBM a full 20 ft container is usually cheaper.
What are the payment terms?
Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.
Which standards does the equipment meet?
We design for NSF/ANSI, UL / ETL listing, local health and fire code. Ask us which certificates are available for this model before ordering.