We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at New York / New Jersey. Typical users in Oregon: QSR kitchens.
Fast Food Kitchen Fabrication price in Oregon
The base model costs ₹12,60,000 ex-works (≈ USD 14,237) package. Here is an estimate for one unit landed in Oregon by the cheapest shipping option:
| Cost element | USD | INR |
|---|---|---|
| Ex-works price | USD 14,237 | ₹12,60,000 |
| Export packing, haulage to JNPT, customs clearance | USD 800 | ₹70,800 |
| Ocean freight (LCL (shared container), 10.0 CBM) | USD 1,100 | ₹97,350 |
| Marine insurance | USD 89 | ₹7,855 |
| CIF New York / New Jersey | USD 16,226 | ₹14,36,005 |
| Import duty (MFN duty + 10% reciprocal tariff on Indian goods + 0.47% MPF/HMF) | USD 0 | ₹0 |
| US Section 232 steel duty (est.) | USD 3,383 | ₹2,99,430 |
| Other import levies | USD 1,574 | ₹1,39,335 |
| Destination clearance & local delivery | USD 1,100 | ₹97,350 |
| Estimated landed cost | USD 22,284 | ₹19,72,120 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Technical specifications
| Standard model | Complete QSR line: fryers, griddle, pass, refrigeration, hood — 300 sq ft |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8419.81 |
| Packed volume / weight | 10 CBM · 1200 kg (base model) |
| Power & fuel in USA | 120 V / 208–240 V, 60 Hz; Natural gas, propane |
| Standards | NSF/ANSI, UL / ETL listing, local health and fire code |
Options you can specify
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Flame-failure devices, piezo ignition and thermostats
- Gas (LPG / PNG / natural gas), electric or induction versions
- Number of burners or tanks and their ratings
- Export builds for 60 Hz and 120/208–240 V supplies
Fast Food Kitchen Fabrication for Oregon kitchens
Related kitchen types we equip in Oregon:
Shipping, customs and installation for Oregon
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to New York / New Jersey (about 32–38 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why buyers in Oregon choose Fabrrinox Potnis
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
FAQs: Fast Food Kitchen Fabrication in Oregon
What does a fast food kitchen fabrication cost delivered to Oregon?
The ex-works price is ₹12,60,000 (about USD 14,237). Shipped from Nhava Sheva to New York / New Jersey with insurance, import duty, taxes and local delivery, one unit lands at roughly USD 22,284. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Oregon take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to New York / New Jersey is about 32–38 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in USA?
We ship the fast food kitchen fabrication under HS 8419.81. Our estimate for USA uses: MFN duty + 10% reciprocal tariff on Indian goods + 0.47% MPF/HMF; Section 232 50% on steel content applies to many steel articles and appliances. Your customs broker confirms the final rate at clearance.
Is there a minimum order quantity?
No fixed minimum. Small orders ship as LCL (shared container) from 1 CBM; above about 15 CBM a full 20 ft container is usually cheaper.
What are the payment terms?
Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.
Which standards does the equipment meet?
We design for NSF/ANSI, UL / ETL listing, local health and fire code. Ask us which certificates are available for this model before ordering.