For Saudi Arabia, we quote ex-works, FOB Nhava Sheva or CIF Dammam / Jeddah, whichever suits your importer. We also deliver to Al Khobar, Dammam and Jeddah.
Hand Dryer Station rate in Saudi Arabia, 2026
The base model costs ₹22,500 ex-works (≈ SAR 953) . Here is an estimate for one unit landed in Saudi Arabia by the cheapest shipping option:
| Cost element | SAR | INR |
|---|---|---|
| Ex-works price | SAR 953 | ₹22,500 |
| Export packing, haulage to JNPT, customs clearance | SAR 622 | ₹14,675 |
| Ocean freight (LCL (shared container), 1.0 CBM) | SAR 188 | ₹4,425 |
| Marine insurance | SAR 9.7 | ₹229 |
| CIF Dammam / Jeddah | SAR 1,772 | ₹41,829 |
| Import duty (GCC common tariff, mostly 5%) | SAR 89 | ₹2,091 |
| Import VAT / GST 15% | SAR 279 | ₹6,588 |
| Destination clearance & local delivery | SAR 188 | ₹4,425 |
| Estimated landed cost | SAR 2,328 | ₹54,933 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Standard model and build
| Standard model | High-speed dryer on SS stand |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8516.33 |
| Packed volume / weight | 0.2 CBM · 15 kg (base model) |
| Power & fuel in Saudi Arabia | 230 V / 400 V, 60 Hz; LPG |
| Standards | SFDA, SASO / SABER conformity, municipality approval |
Custom sizes and options
- Flame-failure devices, piezo ignition and thermostats
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Number of burners or tanks and their ratings
- Gas (LPG / PNG / natural gas), electric or induction versions
- Export builds for 60 Hz and 120/208–240 V supplies
Shipping, customs and installation for Saudi Arabia
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Dammam / Jeddah (about 8–12 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
What you get from the manufacturer
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
FAQs: Hand Dryer Station in Saudi Arabia
What does a hand dryer station cost delivered to Saudi Arabia?
The ex-works price is ₹22,500 (about SAR 953). Shipped from Nhava Sheva to Dammam / Jeddah with insurance, import duty, taxes and local delivery, one unit lands at roughly SAR 2,328. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Saudi Arabia take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Dammam / Jeddah is about 8–12 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Saudi Arabia?
We ship the hand dryer station under HS 8516.33. Our estimate for Saudi Arabia uses: GCC common tariff, mostly 5%; some steel articles are higher. Import VAT/GST of 15% applies on top. Your customs broker confirms the final rate at clearance.
What is the warranty?
12 months against manufacturing defects from installation, and lifetime support on spares. Annual maintenance contracts are available through our service partners.
What power and gas supply does it need in Saudi Arabia?
Supply in Saudi Arabia is 230 V / 400 V, 60 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.
Can the hand dryer station be made to custom size?
Yes. We build it to your drawing or space: gas (LPG / PNG / natural gas), electric or induction versions, number of burners or tanks and their ratings and SS 304 or SS 316 body; 14 or 16 SWG tops. Custom sizes usually add 3–5 working days.