We ship to buyers across Nigeria, including Lagos, Abuja, Ikeja, Lekki Free Zone and Ibadan. We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at Lagos (Apapa / Lekki). Typical users in Nigeria: QSR kitchens, food trucks and food stall & carts.
Hot Plate & Griddle cost in Nigeria
The base model costs ₹33,500 ex-works (≈ NGN 567,797) . Here is an estimate for one unit landed in Nigeria by the cheapest shipping option:
| Cost element | NGN | INR |
|---|---|---|
| Ex-works price | NGN 567,797 | ₹33,500 |
| Export packing, haulage to JNPT, customs clearance | NGN 254,322 | ₹15,005 |
| Ocean freight (LCL (shared container), 1.0 CBM) | NGN 142,508 | ₹8,408 |
| Marine insurance | NGN 5,305 | ₹313 |
| CIF Lagos (Apapa / Lekki) | NGN 969,932 | ₹57,226 |
| Import duty (ECOWAS CET) | NGN 97,000 | ₹5,723 |
| Other import levies | NGN 29,102 | ₹1,717 |
| Import VAT / GST 7.5% | NGN 82,203 | ₹4,850 |
| Destination clearance & local delivery | NGN 142,508 | ₹8,408 |
| Estimated landed cost | NGN 1,320,712 | ₹77,922 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
What the standard model includes
| Standard model | 3 ft, 12 mm plate, thermostatic or manual gas control |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8419.81 |
| Packed volume / weight | 0.5 CBM · 80 kg (base model) |
| Power & fuel in Nigeria | 230 V / 400 V, 50 Hz; LPG |
| Standards | SON SONCAP, NAFDAC |
Sizes and options we build
- Gas (LPG / PNG / natural gas), electric or induction versions
- Number of burners or tanks and their ratings
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Flame-failure devices, piezo ignition and thermostats
- Export builds for 60 Hz and 120/208–240 V supplies
Where the hot plate & griddle is used in Nigeria
Related kitchen types we equip in Nigeria:
Shipping, customs and installation for Nigeria
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Lagos (Apapa / Lekki) (about 26–32 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why Nigeria buyers work with us
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
FAQs: Hot Plate & Griddle in Nigeria
What does a hot plate & griddle cost delivered to Nigeria?
The ex-works price is ₹33,500 (about NGN 567,797). Shipped from Nhava Sheva to Lagos (Apapa / Lekki) with insurance, import duty, taxes and local delivery, one unit lands at roughly NGN 1,320,712. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Nigeria take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Lagos (Apapa / Lekki) is about 26–32 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Nigeria?
We ship the hot plate & griddle under HS 8419.81. Our estimate for Nigeria uses: ECOWAS CET; plus CISS, ETLS and surcharge. Import VAT/GST of 7.5% applies on top. Your customs broker confirms the final rate at clearance.
Which stainless steel grade do you use?
Food-contact parts are SS 304 (18/8) as standard, in 16 or 18 SWG depending on the part. For coastal sites, seafood kitchens and chemical cleaning we recommend SS 316. Every unit is TIG-welded and finished satin.
Can the hot plate & griddle be made to custom size?
Yes. We build it to your drawing or space: gas (LPG / PNG / natural gas), electric or induction versions, number of burners or tanks and their ratings and SS 304 or SS 316 body; 14 or 16 SWG tops. Custom sizes usually add 3–5 working days.
What power and gas supply does it need in Nigeria?
Supply in Nigeria is 230 V / 400 V, 50 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.