ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Centralised & Institutional · Sonipat, Haryana

Industrial Canteen Equipment in Sonipat

Fabrrinox Potnis designs, fabricates and installs complete industrial canteen setups for factories, plants and MIDC/GIDC units in Sonipat, Haryana. We plan shift-wise meals for 200 to 5,000 workers with fast tray lines.

Small setup
₹11,61,918
Medium setup
₹23,23,835
Delivery
4–7 days by road

Equipment for a industrial canteen

EquipmentStandard modelPrice from
Bulk Cooking RangeSingle burner 600×600×450 mm, 3-ring 75₹39,000
Idli Steamer6 trays × 30 idlis, SS 304₹42,000
Rice Steam Cooking Cabinet6 tray, 60 kg rice per batch₹1,19,000
Chapati Plate & Puffer3 ft plate + puffer grill combined, 400–500 chapatis/hour₹36,500
Cafeteria Tray LineTray slide, cutlery dispensers₹77,000
Bain Marie4 well GN 1/1, wet or dry heat₹50,500
Pot Wash SinkDeep 600×600×450 mm bowl, pre-rinse spray₹36,500

Setup cost in Sonipat

Estimates for a typical equipment package, delivered with GST:

SizeEquipment ex-worksDelivered
Small — up to 100 meals a day / 40 covers₹9,72,400₹11,61,918
Medium — 100 to 500 meals a day / 80–120 covers₹19,44,800₹23,23,835
Large — 500 to 2,000 meals a day₹38,18,400₹45,62,359

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a industrial canteen project

  1. Survey and brief — menu, meals per day, space and utilities.
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Delivery and installation — 4–7 days by road, then installation and trials.
  5. Handover and service — staff training, warranty and AMC.

Compliance in India

Kitchens in Sonipat need FSSAI licensing, state fire NOC, PESO for LPG banks above the exemption limit. Supply is 230 V single-phase / 415 V three-phase, 50 Hz; fuel is usually PNG in metro cities, LPG elsewhere. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.

FAQs: Industrial Canteen in Sonipat

What equipment does a industrial canteen need?

A typical industrial canteen needs bulk cooking range, idli steamer, rice steam cooking cabinet, chapati plate & puffer, cafeteria tray line and bain marie, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a industrial canteen in Sonipat?

Our estimate for a small setup is about ₹11,61,918, medium about ₹23,23,835 and large about ₹45,62,359, delivered with GST. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 3–5 weeks, delivery 4–7 days and installation 1–2 weeks for most industrial canteen projects in Sonipat.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in India?

Plan for FSSAI licensing, state fire NOC, PESO for LPG banks above the exemption limit. We design hoods, gas banks and drainage with these approvals in mind.

Do you offer maintenance after installation?

Yes: annual maintenance contracts with preventive visits, exhaust cleaning and spare parts.

Industrial Canteen equipment nearby

Other kitchens we set up in Sonipat

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.