ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Gas, Utility & Safety · Ghana

LPG & PNG Gas Bank and Pipeline Supplier & Exporter to Ghana

Looking for a LPG & PNG gas bank and pipeline supplier for Ghana? We manufacture in India and ship worldwide. The standard model is 10-cylinder manifold or PNG skid, MS/copper pipeline, valves, regulators, built for LPG kitchens.

Price from
₹2,10,000 + GST
HSN code
8481.80
Material
SS 304 (SS 316 on request)
Shipping
24–30 days, Nhava Sheva → Tema

Cargo for Ghana lands at Tema. Combine this unit with other equipment in one container to bring the freight per item down. The same service covers Accra, Tema Free Zone, Tema and Kumasi. Typical users in Ghana: mall & multiplexs and food courts.

How much does a LPG & PNG gas bank and pipeline cost in Ghana?

The base model costs ₹2,10,000 ex-works (≈ GHS 26,250) . Here is an estimate for one unit landed in Ghana by the cheapest shipping option:

Cost elementGHSINR
Ex-works priceGHS 26,250₹2,10,000
Export packing, haulage to JNPT, customs clearanceGHS 2,538₹20,300
Ocean freight (LCL (shared container), 1.0 CBM)GHS 996₹7,965
Marine insuranceGHS 164₹1,310
CIF TemaGHS 29,947₹2,39,575
Import duty (ECOWAS CET)GHS 2,995₹23,958
Other import leviesGHS 749₹5,989
Import VAT / GST 20%GHS 6,738₹53,904
Destination clearance & local deliveryGHS 940₹7,523
Estimated landed costGHS 41,369₹3,30,949

Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.

Specifications

Standard model10-cylinder manifold or PNG skid, MS/copper pipeline, valves, regulators
MaterialSS 304 food grade; SS 316 option
HSN / HS code8481.80
Packed volume / weight1 CBM · 180 kg (base model)
Power & fuel in Ghana230 V / 400 V, 50 Hz; LPG
StandardsGSA, FDA Ghana

Build it to your kitchen

  • Number of burners or tanks and their ratings
  • Gas (LPG / PNG / natural gas), electric or induction versions
  • Flame-failure devices, piezo ignition and thermostats
  • SS 304 or SS 316 body; 14 or 16 SWG tops
  • Export builds for 60 Hz and 120/208–240 V supplies

Kitchens in Ghana that use a LPG & PNG gas bank and pipeline

Related kitchen types we equip in Ghana:

Shipping, customs and installation for Ghana

We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Tema (about 24–30 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.

Why order from Fabrrinox Potnis

  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.

FAQs: LPG & PNG Gas Bank and Pipeline in Ghana

What does a LPG & PNG gas bank and pipeline cost delivered to Ghana?

The ex-works price is ₹2,10,000 (about GHS 26,250). Shipped from Nhava Sheva to Tema with insurance, import duty, taxes and local delivery, one unit lands at roughly GHS 41,369. Ordering several items together in one container cuts the freight per unit sharply.

How long does shipping to Ghana take?

Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Tema is about 24–30 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.

What HS code and import duty apply in Ghana?

We ship the LPG & PNG gas bank and pipeline under HS 8481.80. Our estimate for Ghana uses: ECOWAS CET; plus ECOWAS, AU and EXIM levies. Import VAT/GST of 20% applies on top. Your customs broker confirms the final rate at clearance.

Do you have a dealer in Ghana?

We are appointing authorised dealers and distributors in Ghana. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.

Which standards does the equipment meet?

We design for GSA, FDA Ghana. Ask us which certificates are available for this model before ordering.

What are the payment terms?

Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.

More equipment in Ghana

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.