For Kenya, we quote ex-works, FOB Nhava Sheva or CIF Mombasa, whichever suits your importer. We also deliver to Kisumu, Nakuru and Industrial Area Nairobi. In Kenya it is a common choice for food courts and mall & multiplexs.
LPG & PNG Gas Bank and Pipeline price in Kenya
The base model costs ₹2,10,000 ex-works (≈ KES 306,569) . Here is an estimate for one unit landed in Kenya by the cheapest shipping option:
| Cost element | KES | INR |
|---|---|---|
| Ex-works price | KES 306,569 | ₹2,10,000 |
| Export packing, haulage to JNPT, customs clearance | KES 29,635 | ₹20,300 |
| Ocean freight (LCL (shared container), 1.0 CBM) | KES 7,752 | ₹5,310 |
| Marine insurance | KES 1,892 | ₹1,296 |
| CIF Mombasa | KES 345,848 | ₹2,36,906 |
| Import duty (EAC Common External Tariff) | KES 34,585 | ₹23,691 |
| Other import levies | KES 15,564 | ₹10,661 |
| Import VAT / GST 16% | KES 63,359 | ₹43,401 |
| Destination clearance & local delivery | KES 8,399 | ₹5,753 |
| Estimated landed cost | KES 467,753 | ₹3,20,411 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Technical specifications
| Standard model | 10-cylinder manifold or PNG skid, MS/copper pipeline, valves, regulators |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8481.80 |
| Packed volume / weight | 1 CBM · 180 kg (base model) |
| Power & fuel in Kenya | 240 V / 415 V, 50 Hz; LPG |
| Standards | KEBS PVoC certificate, county health |
Options you can specify
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Flame-failure devices, piezo ignition and thermostats
- Gas (LPG / PNG / natural gas), electric or induction versions
- Number of burners or tanks and their ratings
- Export builds for 60 Hz and 120/208–240 V supplies
LPG & PNG Gas Bank and Pipeline for Kenya kitchens
Browse setups that include this equipment in Kenya:
Shipping, customs and installation for Kenya
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Mombasa (about 12–16 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why buyers in Kenya choose Fabrrinox Potnis
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
FAQs: LPG & PNG Gas Bank and Pipeline in Kenya
What does a LPG & PNG gas bank and pipeline cost delivered to Kenya?
The ex-works price is ₹2,10,000 (about KES 306,569). Shipped from Nhava Sheva to Mombasa with insurance, import duty, taxes and local delivery, one unit lands at roughly KES 467,753. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Kenya take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Mombasa is about 12–16 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Kenya?
We ship the LPG & PNG gas bank and pipeline under HS 8481.80. Our estimate for Kenya uses: EAC Common External Tariff; plus IDF 2.5% and RDL 2%. Import VAT/GST of 16% applies on top. Your customs broker confirms the final rate at clearance.
Which stainless steel grade do you use?
Food-contact parts are SS 304 (18/8) as standard, in 16 or 18 SWG depending on the part. For coastal sites, seafood kitchens and chemical cleaning we recommend SS 316. Every unit is TIG-welded and finished satin.
Can the LPG & PNG gas bank and pipeline be made to custom size?
Yes. We build it to your drawing or space: gas (LPG / PNG / natural gas), electric or induction versions, number of burners or tanks and their ratings and SS 304 or SS 316 body; 14 or 16 SWG tops. Custom sizes usually add 3–5 working days.
What power and gas supply does it need in Kenya?
Supply in Kenya is 240 V / 415 V, 50 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.