ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Gas, Utility & Safety · Tunisia

LPG & PNG Gas Bank and Pipeline Supplier & Exporter to Tunisia

Fabrrinox Potnis exports the LPG & PNG gas bank and pipeline from India to Tunisia. Each unit is built in SS 304 at our Navi Mumbai factory, configured for 230 V / 400 V, 50 Hz, crated for sea freight and shipped to Radès.

Price from
₹2,10,000 + GST
HSN code
8481.80
Material
SS 304 (SS 316 on request)
Shipping
24–28 days, Nhava Sheva → Radès

We ship to buyers across Tunisia, including Tunis. We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at Radès. In Tunisia it is a common choice for mall & multiplexs and food courts.

LPG & PNG Gas Bank and Pipeline rate in Tunisia, 2026

The base model costs ₹2,10,000 ex-works (≈ TND 7,119) . Here is an estimate for one unit landed in Tunisia by the cheapest shipping option:

Cost elementTNDINR
Ex-works priceTND 7,119₹2,10,000
Export packing, haulage to JNPT, customs clearanceTND 688₹20,300
Ocean freight (LCL (shared container), 1.0 CBM)TND 270₹7,965
Marine insuranceTND 44₹1,310
CIF RadèsTND 8,121₹2,39,575
Import duty (Tunisia tariff)TND 812₹23,958
Other import leviesTND 81₹2,396
Import VAT / GST 19%TND 1,713₹50,526
Destination clearance & local deliveryTND 240₹7,080
Estimated landed costTND 10,967₹3,23,535

Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.

Standard model and build

Standard model10-cylinder manifold or PNG skid, MS/copper pipeline, valves, regulators
MaterialSS 304 food grade; SS 316 option
HSN / HS code8481.80
Packed volume / weight1 CBM · 180 kg (base model)
Power & fuel in Tunisia230 V / 400 V, 50 Hz; LPG, natural gas
StandardsINNORPI

Custom sizes and options

  • Export builds for 60 Hz and 120/208–240 V supplies
  • Flame-failure devices, piezo ignition and thermostats
  • SS 304 or SS 316 body; 14 or 16 SWG tops
  • Number of burners or tanks and their ratings
  • Gas (LPG / PNG / natural gas), electric or induction versions

Who buys LPG & PNG gas bank and pipeline in Tunisia

Browse setups that include this equipment in Tunisia:

Shipping, customs and installation for Tunisia

We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Radès (about 24–28 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.

What you get from the manufacturer

  • Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
  • Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.

FAQs: LPG & PNG Gas Bank and Pipeline in Tunisia

What does a LPG & PNG gas bank and pipeline cost delivered to Tunisia?

The ex-works price is ₹2,10,000 (about TND 7,119). Shipped from Nhava Sheva to Radès with insurance, import duty, taxes and local delivery, one unit lands at roughly TND 10,967. Ordering several items together in one container cuts the freight per unit sharply.

How long does shipping to Tunisia take?

Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Radès is about 24–28 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.

What HS code and import duty apply in Tunisia?

We ship the LPG & PNG gas bank and pipeline under HS 8481.80. Our estimate for Tunisia uses: Tunisia tariff. Import VAT/GST of 19% applies on top. Your customs broker confirms the final rate at clearance.

What is the warranty?

12 months against manufacturing defects from installation, and lifetime support on spares. Annual maintenance contracts are available through our service partners.

What power and gas supply does it need in Tunisia?

Supply in Tunisia is 230 V / 400 V, 50 Hz and kitchens commonly use LPG, natural gas. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.

Can the LPG & PNG gas bank and pipeline be made to custom size?

Yes. We build it to your drawing or space: gas (LPG / PNG / natural gas), electric or induction versions, number of burners or tanks and their ratings and SS 304 or SS 316 body; 14 or 16 SWG tops. Custom sizes usually add 3–5 working days.

More equipment in Tunisia

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.