We ship to buyers across Qatar, including Al Wakrah, Mesaieed, Lusail, Doha Industrial Area and Ras Laffan. We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at Hamad Port. Typical users in Doha: gurudwara langar kitchens, construction labour camps and industrial canteens.
Pot Wash Sink cost in Doha
The base model costs ₹36,500 ex-works (≈ QAR 1,502) . Here is an estimate for one unit landed in Doha by the cheapest shipping option:
| Cost element | QAR | INR |
|---|---|---|
| Ex-works price | QAR 1,502 | ₹36,500 |
| Export packing, haulage to JNPT, customs clearance | QAR 621 | ₹15,095 |
| Ocean freight (LCL (shared container), 1.0 CBM) | QAR 182 | ₹4,425 |
| Marine insurance | QAR 13 | ₹308 |
| CIF Hamad Port | QAR 2,318 | ₹56,328 |
| Import duty (GCC common tariff 5%) | QAR 116 | ₹2,816 |
| Destination clearance & local delivery | QAR 200 | ₹4,868 |
| Estimated landed cost | QAR 2,634 | ₹64,012 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
What the standard model includes
| Standard model | Deep 600×600×450 mm bowl, pre-rinse spray |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 7324.10 |
| Packed volume / weight | 0.6 CBM · 50 kg (base model) |
| Power & fuel in Qatar | 240 V / 415 V, 50 Hz; LPG |
| Standards | Ministry of Municipality food safety, Civil Defence |
Sizes and options we build
- Wall-mounted or free-standing
- Bowl sizes and number of bowls
- Pedal, knee or sensor taps
- Drain boards on the left, right or both sides
- SS 304 or SS 316
Where the pot wash sink is used in Doha
Browse setups that include this equipment in Doha:
- Industrial Canteen
- Hostel Mess
- Government Hostel Kitchen
- Police Mess
- Gurudwara Langar Kitchen
- Construction Labour Camp
Shipping, customs and installation for Doha
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Hamad Port (about 7–9 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why Doha buyers work with us
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
FAQs: Pot Wash Sink in Doha
What does a pot wash sink cost delivered to Doha?
The ex-works price is ₹36,500 (about QAR 1,502). Shipped from Nhava Sheva to Hamad Port with insurance, import duty, taxes and local delivery, one unit lands at roughly QAR 2,634. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Doha take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Hamad Port is about 7–9 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Qatar?
We ship the pot wash sink under HS 7324.10. Our estimate for Qatar uses: GCC common tariff 5%. Your customs broker confirms the final rate at clearance.
Which stainless steel grade do you use?
Food-contact parts are SS 304 (18/8) as standard, in 16 or 18 SWG depending on the part. For coastal sites, seafood kitchens and chemical cleaning we recommend SS 316. Every unit is TIG-welded and finished satin.
Can the pot wash sink be made to custom size?
Yes. We build it to your drawing or space: bowl sizes and number of bowls, pedal, knee or sensor taps and drain boards on the left, right or both sides. Custom sizes usually add 3–5 working days.
What power and gas supply does it need in Qatar?
Supply in Qatar is 240 V / 415 V, 50 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.