We ship to buyers across Nigeria, including Abuja, Lagos, Lekki Free Zone, Ikeja and Ibadan. We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at Lagos (Apapa / Lekki).
Potato Peeler rate in Nigeria, 2026
The base model costs ₹59,000 ex-works (≈ NGN 1,000,000) . Here is an estimate for one unit landed in Nigeria by the cheapest shipping option:
| Cost element | NGN | INR |
|---|---|---|
| Ex-works price | NGN 1,000,000 | ₹59,000 |
| Export packing, haulage to JNPT, customs clearance | NGN 267,288 | ₹15,770 |
| Ocean freight (LCL (shared container), 1.0 CBM) | NGN 142,508 | ₹8,408 |
| Marine insurance | NGN 7,746 | ₹457 |
| CIF Lagos (Apapa / Lekki) | NGN 1,417,542 | ₹83,635 |
| Import duty (ECOWAS CET) | NGN 141,746 | ₹8,363 |
| Other import levies | NGN 42,525 | ₹2,509 |
| Import VAT / GST 7.5% | NGN 120,136 | ₹7,088 |
| Destination clearance & local delivery | NGN 142,508 | ₹8,408 |
| Estimated landed cost | NGN 1,864,458 | ₹1,10,003 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Standard model and build
| Standard model | 10 kg/batch abrasive peeler, SS 304 drum |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8438.60 |
| Packed volume / weight | 0.3 CBM · 55 kg (base model) |
| Power & fuel in Nigeria | 230 V / 400 V, 50 Hz; LPG |
| Standards | SON SONCAP, NAFDAC |
Custom sizes and options
- Export builds for 60 Hz and 120/208–240 V supplies
- Flame-failure devices, piezo ignition and thermostats
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Number of burners or tanks and their ratings
- Gas (LPG / PNG / natural gas), electric or induction versions
Shipping, customs and installation for Nigeria
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Lagos (Apapa / Lekki) (about 26–32 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
What you get from the manufacturer
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
FAQs: Potato Peeler in Nigeria
What does a potato peeler cost delivered to Nigeria?
The ex-works price is ₹59,000 (about NGN 1,000,000). Shipped from Nhava Sheva to Lagos (Apapa / Lekki) with insurance, import duty, taxes and local delivery, one unit lands at roughly NGN 1,864,458. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Nigeria take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Lagos (Apapa / Lekki) is about 26–32 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Nigeria?
We ship the potato peeler under HS 8438.60. Our estimate for Nigeria uses: ECOWAS CET; plus CISS, ETLS and surcharge. Import VAT/GST of 7.5% applies on top. Your customs broker confirms the final rate at clearance.
What is the warranty?
12 months against manufacturing defects from installation, and lifetime support on spares. Annual maintenance contracts are available through our service partners.
What power and gas supply does it need in Nigeria?
Supply in Nigeria is 230 V / 400 V, 50 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.
Can the potato peeler be made to custom size?
Yes. We build it to your drawing or space: gas (LPG / PNG / natural gas), electric or induction versions, number of burners or tanks and their ratings and SS 304 or SS 316 body; 14 or 16 SWG tops. Custom sizes usually add 3–5 working days.