ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Hospitality · Dakar, Senegal

Resort Kitchen Equipment in Dakar

Fabrrinox Potnis designs, fabricates and exports complete resort kitchen setups for beach resorts, hill resorts, wellness retreats and safari lodges in Dakar, Senegal. We plan outdoor live stations, a central production kitchen and equipment that resists salt air and humidity.

Small setup
XOF 33,558,181 (₹52,01,518)
Medium setup
XOF 65,265,297 (₹1,01,16,121)
Sea transit
26–30 days to Dakar

Equipment for a resort kitchen

EquipmentStandard modelPrice from
Parrilla GrillWood/charcoal parrilla, wheel-adjusted V-grates₹1,33,000
BarbequeCharcoal BBQ, 1200 mm₹42,000
Live Cooking Counter6 ft show counter with induction or gas hob₹98,000
Walk-in Cold Room8×8×8 ft, 80 mm PUF panels₹5,04,000
Buffet Counter8 ft, hot wells + cold well₹1,19,000
Kitchen Exhaust Hood10 ft wall canopy, baffle filters₹1,05,000
Hood-type Dishwasher60 racks/hour, 85 °C final rinse₹3,64,000
SS Outdoor BBQ Kitchen10 ft island with BBQ grill, sink and fridge space₹5,32,000

Landed setup cost in Dakar

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹33,91,100XOF 33,558,181 (₹52,01,518)
Medium — 100 to 500 meals a day / 80–120 covers₹67,82,200XOF 65,265,297 (₹1,01,16,121)
Large — 500 to 2,000 meals a day₹1,31,10,600XOF 126,263,026 (₹1,95,70,769)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a resort kitchen project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Dakar, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in Senegal

Kitchens in Dakar are checked against ASN. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.

FAQs: Resort Kitchen in Dakar

What equipment does a resort kitchen need?

A typical resort kitchen needs Parrilla grill, barbeque, live cooking counter, walk-in cold room, buffet counter and kitchen exhaust hood, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a resort kitchen in Dakar?

Our estimate for a small setup is about XOF 33,558,181, medium about XOF 65,265,297 and large about XOF 126,263,026, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 26–30 days to Dakar, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in Senegal?

Plan for ASN. We design to these and share technical sheets your consultant needs.

Can you work with our architect or consultant?

Yes. We work from consultant drawings, submit shop drawings for approval and coordinate with MEP contractors on site.

Other kitchens we set up in Dakar

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.