For Qatar, we quote ex-works, FOB Nhava Sheva or CIF Hamad Port, whichever suits your importer. We also deliver to Lusail, Al Wakrah and Mesaieed. In Qatar it is a common choice for naval ship galleys and cruise ship galleys.
Ship Galley Equipment cost in Qatar
The base model costs ₹16,80,000 ex-works (≈ QAR 69,136) package. Here is an estimate for one unit landed in Qatar by the cheapest shipping option:
| Cost element | QAR | INR |
|---|---|---|
| Ex-works price | QAR 69,136 | ₹16,80,000 |
| Export packing, haulage to JNPT, customs clearance | QAR 3,021 | ₹73,400 |
| Ocean freight (LCL (shared container), 6.0 CBM) | QAR 1,093 | ₹26,550 |
| Marine insurance | QAR 403 | ₹9,790 |
| CIF Hamad Port | QAR 73,652 | ₹17,89,740 |
| Import duty (GCC common tariff 5%) | QAR 3,683 | ₹89,487 |
| Destination clearance & local delivery | QAR 1,202 | ₹29,205 |
| Estimated landed cost | QAR 78,536 | ₹19,08,432 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
What the standard model includes
| Standard model | Marine-grade SS 316 galley with fiddle rails |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8419.81 |
| Packed volume / weight | 6 CBM · 900 kg (base model) |
| Power & fuel in Qatar | 240 V / 415 V, 50 Hz; LPG |
| Standards | Ministry of Municipality food safety, Civil Defence |
Sizes and options we build
- Export builds for 60 Hz and 120/208–240 V supplies
- Gas (LPG / PNG / natural gas), electric or induction versions
- Number of burners or tanks and their ratings
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Flame-failure devices, piezo ignition and thermostats
Where the ship galley equipment is used in Qatar
Related kitchen types we equip in Qatar:
Shipping, customs and installation for Qatar
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Hamad Port (about 7–9 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why Qatar buyers work with us
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
FAQs: Ship Galley Equipment in Qatar
What does a ship galley equipment cost delivered to Qatar?
The ex-works price is ₹16,80,000 (about QAR 69,136). Shipped from Nhava Sheva to Hamad Port with insurance, import duty, taxes and local delivery, one unit lands at roughly QAR 78,536. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Qatar take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Hamad Port is about 7–9 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Qatar?
We ship the ship galley equipment under HS 8419.81. Our estimate for Qatar uses: GCC common tariff 5%. Your customs broker confirms the final rate at clearance.
Which stainless steel grade do you use?
Food-contact parts are SS 304 (18/8) as standard, in 16 or 18 SWG depending on the part. For coastal sites, seafood kitchens and chemical cleaning we recommend SS 316. Every unit is TIG-welded and finished satin.
Can the ship galley equipment be made to custom size?
Yes. We build it to your drawing or space: gas (LPG / PNG / natural gas), electric or induction versions, number of burners or tanks and their ratings and SS 304 or SS 316 body; 14 or 16 SWG tops. Custom sizes usually add 3–5 working days.
What power and gas supply does it need in Qatar?
Supply in Qatar is 240 V / 415 V, 50 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.