For Nigeria, we quote ex-works, FOB Nhava Sheva or CIF Lagos (Apapa / Lekki), whichever suits your importer. We also deliver to Ibadan, Port Harcourt and Kano.
SS Drinking Water Station cost in Nigeria
The base model costs ₹1,19,000 ex-works (≈ NGN 2,016,949) . Here is an estimate for one unit landed in Nigeria by the cheapest shipping option:
| Cost element | NGN | INR |
|---|---|---|
| Ex-works price | NGN 2,016,949 | ₹1,19,000 |
| Export packing, haulage to JNPT, customs clearance | NGN 297,797 | ₹17,570 |
| Ocean freight (LCL (shared container), 1.0 CBM) | NGN 142,508 | ₹8,408 |
| Marine insurance | NGN 13,508 | ₹797 |
| CIF Lagos (Apapa / Lekki) | NGN 2,470,763 | ₹1,45,775 |
| Import duty (ECOWAS CET) | NGN 494,153 | ₹29,155 |
| Other import levies | NGN 74,119 | ₹4,373 |
| Import VAT / GST 7.5% | NGN 227,932 | ₹13,448 |
| Destination clearance & local delivery | NGN 142,508 | ₹8,408 |
| Estimated landed cost | NGN 3,409,458 | ₹2,01,158 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
What the standard model includes
| Standard model | 4 tap chilled with RO, SS 304 |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8418.69 |
| Packed volume / weight | 0.8 CBM · 90 kg (base model) |
| Power & fuel in Nigeria | 230 V / 400 V, 50 Hz; LPG |
| Standards | SON SONCAP, NAFDAC |
Sizes and options we build
- SS 304 interior and exterior
- Capacity and door or drawer configuration
- Tropicalised compressors rated for 43 °C ambient
- Eco refrigerants (R290 / R600a) where local rules require
- Digital controllers with temperature alarms
Shipping, customs and installation for Nigeria
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Lagos (Apapa / Lekki) (about 26–32 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why Nigeria buyers work with us
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
FAQs: SS Drinking Water Station in Nigeria
What does a SS drinking water station cost delivered to Nigeria?
The ex-works price is ₹1,19,000 (about NGN 2,016,949). Shipped from Nhava Sheva to Lagos (Apapa / Lekki) with insurance, import duty, taxes and local delivery, one unit lands at roughly NGN 3,409,458. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Nigeria take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Lagos (Apapa / Lekki) is about 26–32 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Nigeria?
We ship the SS drinking water station under HS 8418.69. Our estimate for Nigeria uses: ECOWAS CET; plus CISS, ETLS and surcharge. Import VAT/GST of 7.5% applies on top. Your customs broker confirms the final rate at clearance.
Which stainless steel grade do you use?
Food-contact parts are SS 304 (18/8) as standard, in 16 or 18 SWG depending on the part. For coastal sites, seafood kitchens and chemical cleaning we recommend SS 316. Every unit is TIG-welded and finished satin.
Can the SS drinking water station be made to custom size?
Yes. We build it to your drawing or space: capacity and door or drawer configuration, tropicalised compressors rated for 43 °c ambient and eco refrigerants (r290 / r600a) where local rules require. Custom sizes usually add 3–5 working days.
What power and gas supply does it need in Nigeria?
Supply in Nigeria is 230 V / 400 V, 50 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.