Cargo for Al Khobar lands at Dammam / Jeddah. Combine this unit with other equipment in one container to bring the freight per item down. The same service covers Sudair Industrial City, Riyadh Second Industrial City, Dammam Second Industrial City and Jeddah Industrial City.
How much does a SS work table with drawers cost in Al Khobar?
The base model costs ₹31,000 ex-works (≈ SAR 1,314) . Here is an estimate for one unit landed in Al Khobar by the cheapest shipping option:
| Cost element | SAR | INR |
|---|---|---|
| Ex-works price | SAR 1,314 | ₹31,000 |
| Export packing, haulage to JNPT, customs clearance | SAR 633 | ₹14,930 |
| Ocean freight (LCL (shared container), 1.0 CBM) | SAR 188 | ₹4,425 |
| Marine insurance | SAR 12 | ₹277 |
| CIF Dammam / Jeddah | SAR 2,145 | ₹50,632 |
| Import duty (GCC common tariff, mostly 5%) | SAR 107 | ₹2,532 |
| Import VAT / GST 15% | SAR 338 | ₹7,975 |
| Destination clearance & local delivery | SAR 188 | ₹4,425 |
| Estimated landed cost | SAR 2,778 | ₹65,563 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Specifications
| Standard model | 1800×750 mm with 2 drawers and undershelf |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 9403.20 |
| Packed volume / weight | 0.45 CBM · 48 kg (base model) |
| Power & fuel in Saudi Arabia | 230 V / 400 V, 60 Hz; LPG |
| Standards | SFDA, SASO / SABER conformity, municipality approval |
Build it to your kitchen
- Knock-down construction for export containers
- Undershelf, drawers, splash back, castors or bullet feet
- Any length in 150 mm steps and custom depths
- Satin or mirror finish
- SS 304 throughout or SS 304 top with SS 202 frame
Shipping, customs and installation for Al Khobar
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Dammam / Jeddah (about 8–12 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why order from Fabrrinox Potnis
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
FAQs: SS Work Table with Drawers in Al Khobar
What does a SS work table with drawers cost delivered to Al Khobar?
The ex-works price is ₹31,000 (about SAR 1,314). Shipped from Nhava Sheva to Dammam / Jeddah with insurance, import duty, taxes and local delivery, one unit lands at roughly SAR 2,778. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Al Khobar take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Dammam / Jeddah is about 8–12 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Saudi Arabia?
We ship the SS work table with drawers under HS 9403.20. Our estimate for Saudi Arabia uses: GCC common tariff, mostly 5%; some steel articles are higher. Import VAT/GST of 15% applies on top. Your customs broker confirms the final rate at clearance.
What is the warranty?
12 months against manufacturing defects from installation, and lifetime support on spares. Annual maintenance contracts are available through our service partners.
What power and gas supply does it need in Saudi Arabia?
Supply in Saudi Arabia is 230 V / 400 V, 60 Hz and kitchens commonly use LPG. We build electrical items for that voltage and frequency and fit the right gas jets before shipping.
Can the SS work table with drawers be made to custom size?
Yes. We build it to your drawing or space: any length in 150 mm steps and custom depths, undershelf, drawers, splash back, castors or bullet feet and SS 304 throughout or SS 304 top with SS 202 frame. Custom sizes usually add 3–5 working days.