We ship to buyers across UAE, including Al Quoz, Jebel Ali Free Zone, Al Qusais, Dubai Investment Park and Deira. We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at Jebel Ali. In Ras Al Khor it is a common choice for stadium & event kitchens and airport kitchens.
How much does a stainless steel barricading cost in Ras Al Khor?
The base model costs ₹13,300 ex-works (≈ AED 552) per 2 m panel. Here is an estimate for one unit landed in Ras Al Khor by the cheapest shipping option:
| Cost element | AED | INR |
|---|---|---|
| Ex-works price | AED 552 | ₹13,300 |
| Export packing, haulage to JNPT, customs clearance | AED 597 | ₹14,399 |
| Ocean freight (LCL (shared container), 1.0 CBM) | AED 129 | ₹3,098 |
| Marine insurance | AED 7.01 | ₹169 |
| CIF Jebel Ali | AED 1,285 | ₹30,966 |
| Import duty (0% under the India–UAE CEPA with a CEPA certificate of origin (5% GCC rate without it)) | AED 0 | ₹0 |
| Import VAT / GST 5% | AED 64 | ₹1,548 |
| Destination clearance & local delivery | AED 165 | ₹3,983 |
| Estimated landed cost | AED 1,514 | ₹36,497 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Specifications
| Standard model | 2 m panel × 1.1 m high, 38 mm frame, SS 304 |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 7308.90 |
| Packed volume / weight | 0.12 CBM · 18 kg (base model) |
| Power & fuel in UAE | 230 V / 400 V, 50 Hz; LPG, central gas in new buildings |
| Standards | Dubai Municipality food code, ADAFSA, Civil Defence approval |
Build it to your kitchen
- SS 304 indoor, SS 316 outdoor
- Fixed, removable or interlocking
- Height, panel length and infill pattern
- Anchor plates or flat feet
- Satin, mirror or bead-blast finish
Kitchens in Ras Al Khor that use a stainless steel barricading
Browse setups that include this equipment in Ras Al Khor:
Shipping, customs and installation for Ras Al Khor
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Jebel Ali (about 4–6 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin in the format needed for the preferential duty rate. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why order from Fabrrinox Potnis
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
FAQs: Stainless Steel Barricading in Ras Al Khor
What does a stainless steel barricading cost delivered to Ras Al Khor?
The ex-works price is ₹13,300 (about AED 552). Shipped from Nhava Sheva to Jebel Ali with insurance, import duty, taxes and local delivery, one unit lands at roughly AED 1,514. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Ras Al Khor take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Jebel Ali is about 4–6 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in UAE?
We ship the stainless steel barricading under HS 7308.90. Our estimate for UAE uses: 0% under the India–UAE CEPA with a CEPA certificate of origin (5% GCC rate without it). Import VAT/GST of 5% applies on top. Your customs broker confirms the final rate at clearance.
Do you have a dealer in Ras Al Khor?
We are appointing authorised dealers and distributors in Dubai. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.
Which standards does the equipment meet?
We design for Dubai Municipality food code, ADAFSA, Civil Defence approval. Ask us which certificates are available for this model before ordering.
What are the payment terms?
Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.