We deliver the same model to Durgapur, Siliguri, Salt Lake Sector V, Kalyani and Kolkata, so West Bengal orders can travel together on a shared truck. West Bengal falls in our East, North-East, J&K, Himachal, Islands delivery zone (7–12 days).
Turnkey Kitchen Project price in West Bengal
Fees start at ₹21,00,000 per project for a standard scope. Larger projects are quoted after a site or video survey.
Technical specifications
| Standard model | Design, fabrication, supply, installation, commissioning |
|---|---|
| Power & fuel in India | 230 V single-phase / 415 V three-phase, 50 Hz; PNG in metro cities, LPG elsewhere |
| Standards | FSSAI licensing, state fire NOC, PESO for LPG banks above the exemption limit |
Options you can specify
- Fixed fee or per-project pricing
- Drawings in PDF and CAD
- Scope from a single drawing to full turnkey
- Site survey in India; video survey abroad
- Supervision visits as needed
Delivery and installation in West Bengal
Dispatch is from Navi Mumbai by road; transit to West Bengal is 7–12 days. Equipment arrives wrapped and on pallets; our team installs, connects gas and power, runs trials and hands over with a warranty card.
Why buyers in West Bengal choose Fabrrinox Potnis
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
FAQs: Turnkey Kitchen Project in West Bengal
What is the price of a turnkey kitchen project in West Bengal?
Our turnkey kitchen project starts at ₹21,00,000 per project ex-works for the base model (Design). Delivered to West Bengal with GST at 18% and road freight, the estimate is about ₹24,78,000. Larger sizes, SS 316 and extra features change the price; send your size for an exact quote.
Do you deliver and install in West Bengal?
Yes. We dispatch from our Navi Mumbai factory to West Bengal by road in 7–12 days. Our technicians install the equipment, connect gas, water and power, test it and train your staff. Installation is charged at about 5% of the equipment value, or included in turnkey projects.
What is the HSN code and GST rate for a turnkey kitchen project?
We invoice the turnkey kitchen project under HSN — with GST at 18%. Registered businesses in West Bengal can claim input tax credit on our GST invoice.
Do you have a dealer in West Bengal?
We are appointing authorised dealers and distributors in India. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.
Which standards does the equipment meet?
Our kitchens are designed to help you pass FSSAI licensing, state fire NOC, PESO for LPG banks above the exemption limit. We are ISO 9001:2015 certified.
What are the payment terms?
Usually 50% advance with the order and 50% before dispatch. Government and large corporate orders can be on PO terms.