Cargo for Penang lands at Port Klang. Combine this unit with other equipment in one container to bring the freight per item down. The same service covers Johor Bahru and Kuala Lumpur. Typical users in Penang: QSR kitchens.
Fast Food Kitchen Fabrication rate in Penang, 2026
The base model costs ₹12,60,000 ex-works (≈ MYR 60,577) package. Here is an estimate for one unit landed in Penang by the cheapest shipping option:
| Cost element | MYR | INR |
|---|---|---|
| Ex-works price | MYR 60,577 | ₹12,60,000 |
| Export packing, haulage to JNPT, customs clearance | MYR 3,404 | ₹70,800 |
| Ocean freight (LCL (shared container), 10.0 CBM) | MYR 1,702 | ₹35,400 |
| Marine insurance | MYR 361 | ₹7,514 |
| CIF Port Klang | MYR 66,044 | ₹13,73,714 |
| Import duty (Malaysia tariff (AIFTA may reduce)) | MYR 0 | ₹0 |
| Import VAT / GST 10% | MYR 6,604 | ₹1,37,371 |
| Destination clearance & local delivery | MYR 2,127 | ₹44,250 |
| Estimated landed cost | MYR 74,776 | ₹15,55,336 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Standard model and build
| Standard model | Complete QSR line: fryers, griddle, pass, refrigeration, hood — 300 sq ft |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8419.81 |
| Packed volume / weight | 10 CBM · 1200 kg (base model) |
| Power & fuel in Malaysia | 240 V / 415 V, 50 Hz; LPG, natural gas |
| Standards | SIRIM, ST gas approval |
Custom sizes and options
- Flame-failure devices, piezo ignition and thermostats
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Number of burners or tanks and their ratings
- Gas (LPG / PNG / natural gas), electric or induction versions
- Export builds for 60 Hz and 120/208–240 V supplies
Who buys fast food kitchen fabrication in Penang
Our fast food kitchen fabrication goes into these kinds of kitchens:
Shipping, customs and installation for Penang
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Port Klang (about 9–12 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
What you get from the manufacturer
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
FAQs: Fast Food Kitchen Fabrication in Penang
What does a fast food kitchen fabrication cost delivered to Penang?
The ex-works price is ₹12,60,000 (about MYR 60,577). Shipped from Nhava Sheva to Port Klang with insurance, import duty, taxes and local delivery, one unit lands at roughly MYR 74,776. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Penang take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Port Klang is about 9–12 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Malaysia?
We ship the fast food kitchen fabrication under HS 8419.81. Our estimate for Malaysia uses: Malaysia tariff (AIFTA may reduce); SST 10%. Import VAT/GST of 10% applies on top. Your customs broker confirms the final rate at clearance.
Do you have a dealer in Penang?
We are appointing authorised dealers and distributors in Malaysia. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.
Which standards does the equipment meet?
We design for SIRIM, ST gas approval. Ask us which certificates are available for this model before ordering.
What are the payment terms?
Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.