Industrial & Remote · Kigali, Rwanda

Food Processing Plant Equipment in Kigali

Fabrrinox Potnis designs, fabricates and exports complete food processing plant setups for ready-to-eat, snack, spice and frozen-food manufacturers in Kigali, Rwanda. We plan SS 304 process tables, conveyors, tanks and hygiene stations.

Small setup
RWF 71,831,672 (₹43,81,732)
Medium setup
RWF 136,262,361 (₹83,12,004)
Sea transit
26–32 days to Dar es Salaam + road to Kigali

Equipment for a food processing plant

EquipmentStandard modelPrice from
Food Processing Conveyor Table6 m belt inspection conveyor, SS 304₹2,24,000
SS Storage Tank1,000 L₹2,52,000
SS Platform & LadderProcess platform 3×2 m with ladder and railing₹1,68,000
Boot Wash StationWalk-through sole wash with hand sanitising and turnstile₹1,96,000
Vegetable Cutting Machine300 kg/hour, 5 discs for slicing₹53,000

Landed setup cost in Kigali

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹26,02,500RWF 71,831,672 (₹43,81,732)
Medium — 100 to 500 meals a day / 80–120 covers₹52,05,000RWF 136,262,361 (₹83,12,004)
Large — 500 to 2,000 meals a day₹1,01,97,300RWF 267,297,787 (₹1,63,05,165)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a food processing plant project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Dar es Salaam + road to Kigali, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in Rwanda

Kitchens in Kigali are checked against RSB. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
  • Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.

FAQs: Food Processing Plant in Kigali

What equipment does a food processing plant need?

A typical food processing plant needs food processing conveyor table, SS storage tank, SS platform & ladder, boot wash station and vegetable cutting machine, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a food processing plant in Kigali?

Our estimate for a small setup is about RWF 71,831,672, medium about RWF 136,262,361 and large about RWF 267,297,787, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 26–32 days to Dar es Salaam + road to Kigali, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in Rwanda?

Plan for RSB. We design to these and share technical sheets your consultant needs.

Can you work with our architect or consultant?

Yes. We work from consultant drawings, submit shop drawings for approval and coordinate with MEP contractors on site.

Other kitchens we set up in Kigali

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.