ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Hospitality · Arusha, Tanzania

Hotel Kitchen Equipment in Arusha

Fabrrinox Potnis designs, fabricates and exports complete hotel kitchen setups for 5-star hotels, business hotels, boutique hotels and hotel chains in Arusha, Tanzania. We plan a main production kitchen, banquet kitchen, all-day-dining kitchen, room-service pass and staff cafeteria working off one layout.

Small setup
TZS 149,040,676 (₹50,67,383)
Medium setup
TZS 292,193,059 (₹99,34,564)
Sea transit
14–18 days to Dar es Salaam

Equipment for a hotel kitchen

EquipmentStandard modelPrice from
Chinese Cooking Range2 burner, 1800×900×850 mm₹59,000
Continental Range with Oven4 open burners on gas oven, 900×900×850 mm₹1,01,000
Tilting Bratt Pan80 L, 10 mm SS-clad base₹2,52,000
Combi Oven10 GN 1/1 combi steamer — supply, install and commission₹9,10,000
Walk-in Cold Room8×8×8 ft, 80 mm PUF panels₹5,04,000
Kitchen Exhaust Hood10 ft wall canopy, baffle filters₹1,05,000
Conveyor Dishwasher150–200 racks/hour, pre-wash₹13,30,000
Buffet Counter8 ft, hot wells + cold well₹1,19,000
Gas TandoorSS 304 drum, clay pot 24″₹53,000
Three Bowl Sink3 × 500×500×300 mm bowls, drain boards₹42,000

Landed setup cost in Arusha

Estimates for a typical equipment package, including freight, insurance, duty, taxes and local delivery:

SizeEquipment ex-worksLanded
Small — up to 100 meals a day / 40 covers₹33,91,100TZS 149,040,676 (₹50,67,383)
Medium — 100 to 500 meals a day / 80–120 covers₹67,82,200TZS 292,193,059 (₹99,34,564)
Large — 500 to 2,000 meals a day₹1,31,10,600TZS 564,786,941 (₹1,92,02,756)

Rates as of October 2026. Build your own list in the kitchen setup estimator.

How we deliver a hotel kitchen project

  1. Survey and brief — menu, meals per day, space and utilities (video survey for overseas sites).
  2. Layout and equipment schedule — 2D layout, gas, water, drain and power points.
  3. Fabrication — SS 304 at our Navi Mumbai factory, with inspection before dispatch.
  4. Shipping and clearance — crated and shipped to Dar es Salaam, documents for customs.
  5. Handover and service — staff training, warranty and AMC.

Compliance in Tanzania

Kitchens in Arusha are checked against TBS PVoC. Supply is 230 V / 400 V, 50 Hz and kitchens commonly run on LPG. We build hoods, gas trains and drainage to suit.

Why Fabrrinox Potnis

  • Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
  • Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.

FAQs: Hotel Kitchen in Arusha

What equipment does a hotel kitchen need?

A typical hotel kitchen needs Chinese cooking range, Continental range with oven, tilting bratt pan, combi oven, walk-in cold room and kitchen exhaust hood, plus SS work tables, sinks and racking. The exact list depends on menu and meals per day; we prepare it with the layout.

How much does it cost to set up a hotel kitchen in Arusha?

Our estimate for a small setup is about TZS 149,040,676, medium about TZS 292,193,059 and large about TZS 564,786,941, landed with freight, duty and taxes. Civil, electrical and HVAC works are extra.

How long does the project take?

Design 1–2 weeks, fabrication 4–6 weeks, sea transit 14–18 days to Dar es Salaam, then clearance and installation.

Do you provide the kitchen layout and drawings?

Yes. For complete kitchens we provide a 2D layout, equipment schedule, and gas, water, drain and power points at no charge once the order is confirmed.

Which approvals should the kitchen meet in Tanzania?

Plan for TBS PVoC. We design to these and share technical sheets your consultant needs.

Can you work with our architect or consultant?

Yes. We work from consultant drawings, submit shop drawings for approval and coordinate with MEP contractors on site.

Hotel Kitchen equipment nearby

Other kitchens we set up in Arusha

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.