For Rwanda, we quote ex-works, FOB Nhava Sheva or CIF Dar es Salaam + road to Kigali, whichever suits your importer. We also deliver to Kigali and Kigali Special Economic Zone. It suits mall & multiplexs and food courts in Rwanda.
LPG & PNG Gas Bank and Pipeline rate in Rwanda, 2026
The base model costs ₹2,10,000 ex-works (≈ RWF 3,442,623) . Here is an estimate for one unit landed in Rwanda by the cheapest shipping option:
| Cost element | RWF | INR |
|---|---|---|
| Ex-works price | RWF 3,442,623 | ₹2,10,000 |
| Export packing, haulage to JNPT, customs clearance | RWF 332,787 | ₹20,300 |
| Ocean freight (LCL (shared container), 1.0 CBM) | RWF 159,590 | ₹9,735 |
| Marine insurance | RWF 21,639 | ₹1,320 |
| CIF Dar es Salaam + road to Kigali | RWF 3,956,639 | ₹2,41,355 |
| Import duty (EAC Common External Tariff) | RWF 395,672 | ₹24,136 |
| Other import levies | RWF 59,344 | ₹3,620 |
| Import VAT / GST 18% | RWF 794,098 | ₹48,440 |
| Destination clearance & local delivery | RWF 130,574 | ₹7,965 |
| Estimated landed cost | RWF 5,336,328 | ₹3,25,516 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Standard model and build
| Standard model | 10-cylinder manifold or PNG skid, MS/copper pipeline, valves, regulators |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8481.80 |
| Packed volume / weight | 1 CBM · 180 kg (base model) |
| Power & fuel in Rwanda | 230 V / 400 V, 50 Hz; LPG |
| Standards | RSB |
Custom sizes and options
- Export builds for 60 Hz and 120/208–240 V supplies
- Flame-failure devices, piezo ignition and thermostats
- SS 304 or SS 316 body; 14 or 16 SWG tops
- Number of burners or tanks and their ratings
- Gas (LPG / PNG / natural gas), electric or induction versions
Who buys LPG & PNG gas bank and pipeline in Rwanda
Our LPG & PNG gas bank and pipeline goes into these kinds of kitchens:
Shipping, customs and installation for Rwanda
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Dar es Salaam + road to Kigali (about 26–32 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
What you get from the manufacturer
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
FAQs: LPG & PNG Gas Bank and Pipeline in Rwanda
What does a LPG & PNG gas bank and pipeline cost delivered to Rwanda?
The ex-works price is ₹2,10,000 (about RWF 3,442,623). Shipped from Nhava Sheva to Dar es Salaam + road to Kigali with insurance, import duty, taxes and local delivery, one unit lands at roughly RWF 5,336,328. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Rwanda take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Dar es Salaam + road to Kigali is about 26–32 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Rwanda?
We ship the LPG & PNG gas bank and pipeline under HS 8481.80. Our estimate for Rwanda uses: EAC Common External Tariff. Import VAT/GST of 18% applies on top. Your customs broker confirms the final rate at clearance.
Do you have a dealer in Rwanda?
We are appointing authorised dealers and distributors in Rwanda. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.
Which standards does the equipment meet?
We design for RSB. Ask us which certificates are available for this model before ordering.
What are the payment terms?
Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.