We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at Singapore. In Jurong Industrial Estate it is a common choice for mining camp kitchens, hospital kitchens and resort kitchens.
How much does a walk-in cold room cost in Jurong Industrial Estate?
The base model costs ₹5,04,000 ex-works (≈ SGD 7,358) . Here is an estimate for one unit landed in Jurong Industrial Estate by the cheapest shipping option:
| Cost element | SGD | INR |
|---|---|---|
| Ex-works price | SGD 7,358 | ₹5,04,000 |
| Export packing, haulage to JNPT, customs clearance | SGD 502 | ₹34,370 |
| Ocean freight (LCL (shared container), 4.5 CBM) | SGD 203 | ₹13,939 |
| Marine insurance | SGD 44 | ₹3,038 |
| CIF Singapore | SGD 8,107 | ₹5,55,346 |
| Import duty (0% duty) | SGD 0 | ₹0 |
| Import VAT / GST 9% | SGD 730 | ₹49,981 |
| Destination clearance & local delivery | SGD 320 | ₹21,904 |
| Estimated landed cost | SGD 9,157 | ₹6,27,231 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Specifications
| Standard model | 8×8×8 ft, 80 mm PUF panels, +2 to +8 °C, SS 304 floor |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8418.69 |
| Packed volume / weight | 4.5 CBM · 700 kg (base model) |
| Power & fuel in Singapore | 230 V / 400 V, 50 Hz; Town gas, LPG |
| Standards | SFA, PUB grease trap rules |
Build it to your kitchen
- Tropicalised compressors rated for 43 °C ambient
- Capacity and door or drawer configuration
- Digital controllers with temperature alarms
- Eco refrigerants (R290 / R600a) where local rules require
- SS 304 interior and exterior
Kitchens in Jurong Industrial Estate that use a walk-in cold room
Our walk-in cold room goes into these kinds of kitchens:
- Hotel Kitchen
- Resort Kitchen
- Centralised Kitchen
- Military Kitchen
- Air Force Mess
- Airport Kitchen
- Inflight Catering Kitchen
- Railway Base Kitchen
Shipping, customs and installation for Jurong Industrial Estate
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Singapore (about 8–10 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why order from Fabrrinox Potnis
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
- Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
- Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
FAQs: Walk-in Cold Room in Jurong Industrial Estate
What does a walk-in cold room cost delivered to Jurong Industrial Estate?
The ex-works price is ₹5,04,000 (about SGD 7,358). Shipped from Nhava Sheva to Singapore with insurance, import duty, taxes and local delivery, one unit lands at roughly SGD 9,157. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Jurong Industrial Estate take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Singapore is about 8–10 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Singapore?
We ship the walk-in cold room under HS 8418.69. Our estimate for Singapore uses: 0% duty; 9% GST on import. Import VAT/GST of 9% applies on top. Your customs broker confirms the final rate at clearance.
Do you have a dealer in Jurong Industrial Estate?
We are appointing authorised dealers and distributors in Singapore. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.
Which standards does the equipment meet?
We design for SFA, PUB grease trap rules. Ask us which certificates are available for this model before ordering.
What are the payment terms?
Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.