ISO 9001:2015 · Manufacturer since 2004 · Exports to 70+ countries+91 93212 22135 · sales@fabrinoxpotnisindia.com
Get a Quote

Cooking Equipment · Ras Laffan, Qatar

Gas Tandoor Supplier & Exporter to Ras Laffan

Fabrrinox Potnis exports the gas tandoor from India to Ras Laffan, Qatar. Each unit is built in SS 304 at our Navi Mumbai factory, configured for 240 V / 415 V, 50 Hz, crated for sea freight and shipped to Hamad Port.

Price from
₹53,000 + GST
HSN code
8419.81
Material
SS 304 (SS 316 on request)
Shipping
7–9 days, Nhava Sheva → Hamad Port

We ship to buyers across Qatar, including Al Wakrah, Lusail, Doha, Mesaieed and Doha Industrial Area. We ship LCL from 1 CBM or full containers and coordinate with your clearing agent at Hamad Port. In Ras Laffan it is a common choice for restaurant kitchens, banquet & wedding caterings and hotel kitchens.

Gas Tandoor rate in Ras Laffan, 2026

The base model costs ₹53,000 ex-works (≈ QAR 2,181) . Here is an estimate for one unit landed in Ras Laffan by the cheapest shipping option:

Cost elementQARINR
Ex-works priceQAR 2,181₹53,000
Export packing, haulage to JNPT, customs clearanceQAR 642₹15,590
Ocean freight (LCL (shared container), 1.0 CBM)QAR 182₹4,425
Marine insuranceQAR 17₹402
CIF Hamad PortQAR 3,021₹73,417
Import duty (GCC common tariff 5%)QAR 151₹3,671
Destination clearance & local deliveryQAR 200₹4,868
Estimated landed costQAR 3,373₹81,955

Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.

Standard model and build

Standard modelSS 304 drum, clay pot 24″, insulated, LPG/PNG burner with flame-failure device
MaterialSS 304 food grade; SS 316 option
HSN / HS code8419.81
Packed volume / weight0.7 CBM · 120 kg (base model)
Power & fuel in Qatar240 V / 415 V, 50 Hz; LPG
StandardsMinistry of Municipality food safety, Civil Defence

Custom sizes and options

  • Flame-failure devices, piezo ignition and thermostats
  • SS 304 or SS 316 body; 14 or 16 SWG tops
  • Number of burners or tanks and their ratings
  • Gas (LPG / PNG / natural gas), electric or induction versions
  • Export builds for 60 Hz and 120/208–240 V supplies

Who buys gas tandoor in Ras Laffan

Related kitchen types we equip in Ras Laffan:

Shipping, customs and installation for Ras Laffan

We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Hamad Port (about 7–9 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.

What you get from the manufacturer

  • Design to handoverLayout drawings, fabrication, delivery, installation, gas and exhaust commissioning, and AMC.
  • Since 2004Founded by Mr Dilip Potnis, with 35+ years of commercial kitchen experience behind the designs.
  • SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
  • Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.

FAQs: Gas Tandoor in Ras Laffan

What does a gas tandoor cost delivered to Ras Laffan?

The ex-works price is ₹53,000 (about QAR 2,181). Shipped from Nhava Sheva to Hamad Port with insurance, import duty, taxes and local delivery, one unit lands at roughly QAR 3,373. Ordering several items together in one container cuts the freight per unit sharply.

How long does shipping to Ras Laffan take?

Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Hamad Port is about 7–9 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.

What HS code and import duty apply in Qatar?

We ship the gas tandoor under HS 8419.81. Our estimate for Qatar uses: GCC common tariff 5%. Your customs broker confirms the final rate at clearance.

Do you have a dealer in Ras Laffan?

We are appointing authorised dealers and distributors in Qatar. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.

Which standards does the equipment meet?

We design for Ministry of Municipality food safety, Civil Defence. Ask us which certificates are available for this model before ordering.

What are the payment terms?

Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.

Gas Tandoor in nearby locations

More equipment in Ras Laffan

Planning a kitchen or an SS fabrication project?

Send your layout or equipment list. You get a priced quotation, drawings and delivery schedule within 24 working hours.