Cargo for Tanger Med lands at Casablanca. Combine this unit with other equipment in one container to bring the freight per item down. The same service covers Rabat, Casablanca, Tangier and Marrakech. Typical users in Tanger Med: IT park food courts, restaurant kitchens and hotel kitchens.
How much does a Chinese cooking range cost in Tanger Med?
The base model costs ₹59,000 ex-works (≈ MAD 6,146) . Here is an estimate for one unit landed in Tanger Med by the cheapest shipping option:
| Cost element | MAD | INR |
|---|---|---|
| Ex-works price | MAD 6,146 | ₹59,000 |
| Export packing, haulage to JNPT, customs clearance | MAD 1,643 | ₹15,770 |
| Ocean freight (LCL (shared container), 1.2 CBM) | MAD 996 | ₹9,558 |
| Marine insurance | MAD 48 | ₹464 |
| CIF Casablanca | MAD 8,833 | ₹84,792 |
| Import duty (Morocco tariff) | MAD 883 | ₹8,479 |
| Other import levies | MAD 22 | ₹212 |
| Import VAT / GST 20% | MAD 1,948 | ₹18,697 |
| Destination clearance & local delivery | MAD 885 | ₹8,496 |
| Estimated landed cost | MAD 12,570 | ₹1,20,676 |
Estimate based on rates as of October 2026. Duties and freight change often; your customs broker confirms the final figure. Use the landed cost calculator for multiple items.
Specifications
| Standard model | 2 burner, 1800×900×850 mm, SS 304 body, 1.5 mm top, 2× 80,000 BTU duck-mouth burners, water tap & drain |
|---|---|
| Material | SS 304 food grade; SS 316 option |
| HSN / HS code | 8419.81 |
| Packed volume / weight | 1.2 CBM · 150 kg (base model) |
| Power & fuel in Morocco | 220 V / 380 V, 50 Hz; LPG |
| Standards | ONSSA, IMANOR |
Build it to your kitchen
- Export builds for 60 Hz and 120/208–240 V supplies
- Number of burners or tanks and their ratings
- Gas (LPG / PNG / natural gas), electric or induction versions
- Flame-failure devices, piezo ignition and thermostats
- SS 304 or SS 316 body; 14 or 16 SWG tops
Kitchens in Tanger Med that use a Chinese cooking range
Related kitchen types we equip in Tanger Med:
Shipping, customs and installation for Tanger Med
We pack in fumigated wooden crates, stuff the container at our factory or at Nhava Sheva, and ship to Casablanca (about 22–28 days). You receive the commercial invoice with HS codes, packing list, bill of lading and certificate of origin. Installation is done by your contractor using our drawings and video support, or by our technicians on a site visit for larger projects.
Why order from Fabrrinox Potnis
- Spares and serviceBurners, valves, castors and filters stocked; service by our team in India and partners abroad.
- Export readySeaworthy crating, HS-coded invoices, certificate of origin and documents for customs.
- SS 304 as standardFood-contact surfaces in SS 304, with SS 316 for coastal, marine and chemical environments.
- Own factoryBuilt at our MIDC Pawane, Navi Mumbai plant: you deal with the manufacturer, not a trader.
FAQs: Chinese Cooking Range in Tanger Med
What does a Chinese cooking range cost delivered to Tanger Med?
The ex-works price is ₹59,000 (about MAD 6,146). Shipped from Nhava Sheva to Casablanca with insurance, import duty, taxes and local delivery, one unit lands at roughly MAD 12,570. Ordering several items together in one container cuts the freight per unit sharply.
How long does shipping to Tanger Med take?
Manufacturing takes 10–20 working days. Sea transit from Nhava Sheva (JNPT) to Casablanca is about 22–28 days, plus customs clearance. We share the bill of lading, invoice, packing list and certificate of origin before the vessel arrives.
What HS code and import duty apply in Morocco?
We ship the Chinese cooking range under HS 8419.81. Our estimate for Morocco uses: Morocco tariff. Import VAT/GST of 20% applies on top. Your customs broker confirms the final rate at clearance.
Do you have a dealer in Tanger Med?
We are appointing authorised dealers and distributors in Morocco. Until then we supply directly from the factory. If you sell kitchen equipment, see our distributor programme.
Which standards does the equipment meet?
We design for ONSSA, IMANOR. Ask us which certificates are available for this model before ordering.
What are the payment terms?
Usually 30% advance and 70% against copy of the bill of lading, or an irrevocable letter of credit at sight.